Dwr Cymru Cyfyngedig – AMP8 Tanks Maintenance Strategy

Notice under regulation 28(4) of the Water Supply (Water Quality) Regulations 2018

Reference: DWR-2023-00008

Version Number: 1

Water undertaker as appointed under section 6 of The Water Industry Act 1991 (as amended): Dwr Cymru Cyfyngedig, with registered number 02366777 (hereinafter called ‘the Company’). 

Assets Affected:

Asset Name

Tank Name

Reference

Bolton Hill WTW

Contact Tank

T120030

Glascoed WTW

Contact Tank

T706250

Llwynon WTW

Contact Tank

T67149

Llwynon WTW

Final Water Tank

T67149

Whitbourne WTW

Contact Tank

T54712

Cwellyn WTW

Contact Tank

T603212

Elan WTW

Contact Tank

T54227

Preseli WTW

Contact Tank

T123153

Monmouth WTW

Contact Tank & Final Water tank

T54494

Gwastadgoed WTW

Interstage Tank

T625032

Penybont WTW

Treated Water Tank

T604612

Builth WTW

Contact Tank

T54075

Table 1: List of assets affected and associated reference numbers

Details of this Notice:

  1. The Drinking Water Inspectorate (‘the Inspectorate’) has received a regulation 28(1) report of the Water Supply (Water Quality) Regulations 2018 (‘the Regulations’) from the Company dated 13 October 2023, which states that there is or has been a significant risk of supplying water from the sites listed in Table 1 above (and associated assets as applicable) that could constitute a potential danger to human health or could be unwholesome.
  2. Consequently, this Notice is served on the Company by the Inspectorate on behalf of the Welsh Ministers, under regulation 28(4) for the assets listed above, for risks associated with:

Asset

Description of Risk

Hazard/ Hazardous Event/ Parameter

Hazard I D

Bolton Hill WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

Contact Tank. Inability to fully clean or isolate asset and or chamber due to operational issues (e.g. poor inlet control, lack of bypass or isolation facility). Potential microbiological risk.

D112735

Glascoed WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

Contact Tank. Inability to fully clean or isolate asset and or chamber due to operational issues (e.g. poor inlet control, lack of bypass or isolation facility). Potential microbiological risk.

D111867

Llwynon WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

Contact Tank. Inability to fully clean or isolate asset and or chamber due to operational issues (e.g. poor inlet control, lack of bypass or isolation facility). Potential microbiological risk.

D113210

Llwynon WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

On-site CWT/ FWT. Inability to fully clean or isolate asset and or chamber due to operational issues (e.g. poor inlet control, lack of bypass or isolation facility). Potential microbiological risk.

D113228

Whitbourne WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

On-site Contact tank. Inability to fully clean or isolate asset and or chamber due to operational issues (e.g. poor inlet control, lack of bypass or isolation facility). Potential microbiological risk.

D114959

Cwellyn WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

Contact Tank. Inability to fully clean or isolate asset and or chamber due to operational issues (e.g. poor inlet control, lack of bypass or isolation facility). Potential microbiological risk.

D113576

Elan WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

Contact Tank. Inability to fully clean or isolate asset and or chamber due to operational issues (e.g. poor inlet control, lack of bypass or isolation facility). Potential microbiological risk.

D102194

Preseli WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

Contact Tank. Inability to fully clean or isolate asset and or chamber due to operational issues (e.g. poor inlet control, lack of bypass or isolation facility). Potential microbiological risk.

D184707

Monmouth WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

Contact tank and On-site CWT/ FWT. Inability to fully clean or isolate asset and or chamber due to operational issues (e.g. poor inlet control, lack of bypass or isolation facility). Potential microbiological risk.

D106695

Gwastadgoed WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

Failure of Interstage tank (e.g. undersized tank, structural issues, lack of bypass or isolation facility) post contact tank – pre FWT. Potential microbiological risk

D179614

Penybont WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

On-site Treated Tank. Inability to fully clean or isolate asset and or chamber due to operational issues (e.g. poor inlet control, lack of bypass or isolation facility). Potential microbiological risk.

D110633

Builth WTW

Risk of lack of resilience for high consequence, low probability event – single compartment

Contact Tank. Inability to fully clean or isolate asset and or chamber due to operational issues (e.g. poor inlet control, lack of bypass or isolation facility). Potential microbiological risk.

D114575

Table 2: Table of the hazards, hazardous events, and/or parameters covered by this notice, including the Hazard I D numbers and the description of risks.

  1. The Company are required to satisfy the following requirements.

The date given is that until or by which the requirements must be maintained or satisfied, as appropriate.

Requirements:

(a) To maintain the following measures for the period specified in each case:

  1. For each tank listed in Table 1, maintain proactive, external site inspections, grounds maintenance, site security and asset maintenance programme, including periodic inspections of hatches, seals, redundant assets, sample taps, overflows, washouts, and air valves. Ensure these checks are documented.
    Date: Ongoing for the duration of this notice
  2. Operate each tank listed in Table 1 in accordance with company policy, standards, and procedures, aligning with recognised standards of good practice.
    Date: Ongoing for the duration of this notice
  3. Carry out investigatory sampling in response to any microbiological exceedances, in any tank listed in Table 1 in line with company procedures.
    Date: Ongoing for the duration of this notice
  1. Carry out annual Remotely Operated Vehicle (ROV) surveys for all tanks named in this Notice that are over a 10 year internal inspection frequency.
    Date: Ongoing for the duration of this notice
  2. Maintain enhanced monitoring (in addition to statutory sampling) for, as a minimum, colony counts, E. coli, and total coliforms. Date: Ongoing for the duration of this notice
  1. Review and update as appropriate contingency plans for any tanks listed in Table 1 (including liaison with relevant stakeholders as appropriate) to protect human health. To include as a minimum, a review of:
  • Alternative supply arrangements,
  • Rezoning options,
  • Bottled water collection locations,
  • Tankering into service reservoir procedure,
  • Sampling locations, frequency and parameters,
  • Checks of critical valves.
    Date: Ongoing for the duration of this notice

(b) To review, revise or make operational the following measures, by the dates specified in each case:

  1. Review and confirm the appropriateness of the proposed solutions to remove all contact and other tanks listed in this notice, from service for maintenance.
    Date: 31 March 2025
  2. Confirm the completion of the designs and expected start dates for construction of the agreed solutions to remove all contact and other tanks listed in this notice, from service for maintenance.
    Date: 31 March 2026
  3. Bolton Hill WTW contact tank – complete construction and commissioning (remove tank from service, inspect, repair (where required) and clean).
    Date: 31 March 2029
  4. Glascoed WTW contact tank – complete construction and commissioning (remove tank from service, inspect, repair (where required) and clean).
    Date: 31 March 2029
  5. Llwynon WTW contact tank and final water tank – complete construction and commissioning (remove tanks from service, inspect, repair (where required) and clean).
    Date: 31 March 2027
  6. Whitbourne WTW contact tank – complete construction and commissioning (remove tank from service, inspect, repair (where required) and clean).
    Date: 31 March 2028
  7. Cwellyn WTW contact tank – complete construction and commissioning (remove tank from service, inspect, repair (where required) and clean).
    Date: 31 March 2028
  8. Elan WTW contact tank – complete construction and commissioning (remove tank from service, inspect, repair (where required) and clean).
    Date: 31 March 2028
  9. Preseli WTW contact tank – complete construction and commissioning (remove tank from service, inspect, repair (where required) and clean).
    Date: 31 March 2028
  10. Monmouth WTW contact tank and final water tank – complete construction and commissioning (remove tanks from service, inspect, repair (where required) and clean).
    Date: 31 March 2028
  11. Gwastadgoed WTW interstage tank – complete construction and commissioning (remove tank from service, inspect, repair (where required) and clean).
    Date: 31 March 2027
  12. Penybont WTW treated water tank – complete construction and commissioning (remove tank from service, inspect, repair (where required) and clean).
    Date: 31 March 2027
  13. Builth WTW contact tank – complete construction and commissioning (remove tank from service, inspect, repair (where required) and clean).
    Date: 31 March 2028

(c) To audit whether the measures have been effective by the following means:

  1. Define an audit strategy to monitor the effectiveness of the measures specified in sections (a) and (b).
    Date: 31 July 2024
  2. Implement, and keep under continuous review, the audit strategy defined in measure (c)1.
    Date: Following completion of measure (c)1. onwards.

(d) Not to supply water for regulation 4(1) purposes from the treatment works listed in table 1 of this notice, or not to so supply unless the specified conditions below are satisfied:

  1. Not applicable

(e) To provide the following information in the time and manner specified below to enable monitoring of progress towards the mitigation of the risks:

  1. Provide a progress report annually.
    Date: by 31 January each year.
  2. Report on the confirmation of the appropriateness of the proposed solutions for all assets listed in this notice.
    Date: 30 April 2025
  3. Confirm completion of design (and provide a copy of the designs) and expected start date for construction of the proposed solutions.
    Date: 30 April 2026
  4. Report on the completion of construction and successful isolation and inspection of the Llwynon, Gwastadgoed and Penybont tanks.
    Date: 30 April 2027
  5. Report on the completion of construction and successful isolation and inspection of Whitbourne, Cwellyn, Elan, Preseli, Monmouth and Builth tanks.
    Date: 30 April 2028
  6. Report on the completion of construction and successful isolation and inspection of Bolton Hill and Glascoed tanks.
    Date: 30 April 2029
  7. Submit the audit strategy for auditing the effectiveness of the measures, as specified in measure (c)1.
    Date: 31 August 2024
  8. Submit any revisions of the audit strategy produced under measure (c)2.
    Date: Within 1 month of a revision
  9. Submit a report in the event that any completed measures of this Notice need to be altered in any way, for any reason.
    Date: Ongoing for the duration of this notice
  10. Submit a satisfactory completion report accompanied by a revised regulation 28(1) report with Board level Director sign-off.
    Date: 30 April 2030

Further Details of this Notice:

  1. Any product or substance used as a result of the requirements in this Notice must comply with regulation 31.
  2. Under regulation 28(6) the Inspectorate, on behalf of the Welsh Ministers, may by notice served on the Company, revoke or vary this Notice.
  3. Failure by the Company to comply with this Notice may result in enforcement proceedings under section 18 of the Water Industry Act 1991 (as amended).

Signed


Nicholas Adjei
Deputy Chief Inspector, on behalf of the Welsh Ministers
30 May 2024
Reference: DWR-2023-00008