Northumbrian Water Limited – Gunnerton Contact Tank

Notice under regulation 28(4) of the Water Supply (Water Quality) Regulations 2016 (as amended)

Reference: NES-2024-00002

Version Number: 1

Water undertaker as appointed under section 6 of the Water Industry Act 1991 (as amended): Northumbrian Water Limited, with registered number 02366703 (hereinafter called ‘the company’).

Assets Affected:

  1. Gunnerton Water Treatment Works (T0700325)

Details of this Notice:

  1. The Drinking Water Inspectorate (‘the Inspectorate’) has received a regulation 28(1) report of the Water Supply (Water Quality) Regulations 2016 (as amended) (‘the Regulations’) from the company dated 15 April 2024, which states that there is or has been a significant risk of supplying water from Gunnerton treatment works (and associated assets as applicable) that could constitute a potential danger to human health or could be unwholesome.
  2. Consequently, this Notice is served on the company by the Inspectorate on behalf of the Secretary of State, under regulation 28(4) for the assets listed above, for risks associated with:

Description of Risk

Hazard/ Hazardous Event/ Parameter

Hazard I D

To address the risk of ingress contamination and microbial growth.

Total Coliforms (Confirmed)

NNE_TRE_T0700325_C001_CFH

To address the risk of ingress contamination and microbial growth

E. coli (Confirmed)

NNE_ TRE_T0700325_C002_CFH

To address the risk of ingress contamination and microbial growth

Clostridium Perfringens (Confirmed)

NNE_ TRE_T0700325_C004A_CFH

To address the risk of ingress contamination and microbial growth

Colony Counts at 22oC

NNE_ TRE_T0700325_C007_CFH

To address the risk of ingress contamination and microbial growth

Residual Disinfectant – Total

NNE_ TRE_T0700325_C010_CFH

To address the risk of ingress contamination and microbial growth

Residual Disinfectant – Free

NNE_ TRE_T0700325_C009_CFH

Table 1: Table of the hazards, hazardous events, and/or parameters covered by this Notice, including the Hazard I D numbers and the description of risks.
  1. The company are required to satisfy the following requirements.

The date given is that until or by which the requirements must be maintained or satisfied, as appropriate.

Requirements:

(a) To maintain the following measures for the period specified in each case:

  1. Operate the service reservoir in accordance with current company policy, standards and procedures aligning recognised standards of good practice.
    Date: Ongoing for the duration of this Notice
  2. Enhanced microbiological monitoring where service reservoir has not been inspected in accordance with the company’s policy. Including; where new risks to water quality from the asset are identified.
    Date: Ongoing for the duration of this Notice
  3. Complete frequent service reservoir maintenance check visits and escalate issues that present a water quality risk in accordance with company policy and procedures.
    Date: Ongoing for the duration of this Notice
  4. Proactive grounds maintenance on all service reservoir sites and at outflow discharge points.
    Date: Ongoing for the duration of this Notice
  5. Maintain records of remedial work completed on the reservoir.
    Date: Ongoing for the duration of this Notice
  6. Maintain contingency plans to protect human health in the event of a risk associated with drinking water quality, which should include liaison with local authorities and UKHSA.
    Date: Ongoing for the duration of this Notice

(b) To review, revise or make operational the following measures, by the dates specified in each case:

  1. Define and develop a programme of works to construct a contact tank at Gunnerton works including confirmation of the construction completion date. 

DATE: 28 February 2025

  1. Complete the construction, installation and commissioning of the new contact tank as specified under measure (b)1. 

DATE: Date to be confirmed by 28 February 2025

(c) To audit whether the measures have been effective by the following means:

  1. Define an audit strategy to monitor the effectiveness of the measures specified in sections (a) and (b).
    Date: 28 February 2025
  2. Implement, and keep under continuous review, the audit strategy defined in measure (c)1.
    Date: Following completion of measure (c)1. onwards.

(d) Not to supply water for Regulation 4(1) purposes from Gunnerton treatment works, or not to so supply unless the specified conditions below are satisfied:

  1. Not applicable

(e) To provide the following information in the time and manner specified below to enable monitoring of progress towards the mitigation of the risks:

  1. Provide a progress report annually.
    Date: by 31 January each year.
  2. Submit the programme of works to construct a contact tank at Gunnerton works including confirmation of the construction completion date as specified in measure (b)1. 
    Date: 31 March 2025
  3. Submit the report confirming the completion of the construction, installation and commissioning of the new contact tank as specified under measure (b)2. 
  4. Date: Date to be confirmed by 31 March 2025
  5. Submit the audit strategy for auditing the effectiveness of the measures, as specified in measure (c)1.
    Date: 31 March 2025
  6. Submit any revisions of the audit strategy produced under measure (c)2.
    Date: Within 1 month of a revision
  7. Submit a report in the event that any completed measures of this Notice need to be altered in any way, for any reason.
    Date: Ongoing for the duration of this Notice
  8. Submit a satisfactory completion report accompanied by a revised regulation 28(1) report with Board level Director sign-off.
    Date: Date to be confirmed by 28 February 2025

Further Details of this Notice:

  1. Any product or substance used as a result of the requirements in this Notice must comply with Regulation 31.
  2. Under Regulation 28(6) the Inspectorate, on behalf of the Secretary of State, may by notice served on the Company, revoke or vary this Notice.
  3. Failure by the Company to comply with this Notice may result in enforcement proceedings under section 18 of the Water Industry Act 1991 (as amended).

Signed

 

Nicholas Adjei
Deputy Chief Inspector, on behalf of the Secretary of State for Environment, Food and Rural Affairs
27 August 2024
Reference: NES-2024-00002

Back to top