Portsmouth Water Limited: All Catchments Risk Assessments

Notice under regulation 27(4) of the Water Supply (Water Quality) Regulations 2016 (as amended)

Reference: PRT-2020-00002

Version Number: 3

Water undertaker as appointed under section 6 of the Water Industry Act 1991 (as amended): Portsmouth Water Limited, with registered number 02536455 (hereinafter called ‘the Company’).

Assets affected:

Asset Name

Asset Reference

Corresponding Water Supply System Reference

Aldingbourne catchment and abstraction

CALD and AALD

YWSP-BOG

Havant & Bedhampton Springs catchment and abstractions

CBH, CHAS, ABED, and AHAS

YWSP-POS

Brickkiln catchment and abstraction

CBKK and ABKK

YWSP-CHI

Eastergate catchment and abstraction

CEGT and AEGT

YWSP-BOG

Fishbourne catchment and abstraction

CFSH and AFSH

YWSP-CHI

Funtington catchment and abstraction

CFUN and AFUN

YWSP-CHI

River Itchen (Gator’s Mill) catchment and abstraction

CGAM and AGAM

YWSP-HSH

Lavant catchment and abstraction

CLAV and ALAV

YWSP-CHI

Lovedean catchment and abstraction

CLOV and ALOV

YWSP-LOV

Lower Upham catchment and abstraction

CLUP and ALUP

YWSP-HSH

Maindell catchment and abstraction

CMAI and AMAI

YWSP-HSH

Northbrook catchment and abstraction

CNBK and ANBK

YWSP-HSH

Newtown catchment and abstraction

CNEW and ANEW

YWSP-FDR

Slindon catchment and abstraction

CSLN and ASLN

YWSP-BOG

Soberton catchment and abstraction

CSOB and ASOB

YWSP-FDR; YWSP-HSH

Walderton catchment and abstraction

CWAL and AWAL

YWSP-WAL

Westergate catchment and abstraction

CWGT and AWGT

YWSP-BOG

World’s End catchment and abstraction

CWND and AWND

YWSP-WND

West Street catchment and abstraction

CWST and AWST

YWSP-HSH

Table1: assets affected by this notice.

Details of this Notice:

1. This Notice is served on the Company by the Drinking Water Inspectorate on behalf of the Secretary of State, under regulation 27(4) of the Water Supply (Water Quality) Regulations 2016 (as amended) for the assets listed above, for risks associated with:

  • Ground truthing/site walkovers of hazards;
  • Review of land usage hazards;
  • Source-pathway risk analysis of identified catchment hazards;
  • Risk from Cryptosporidium and turbidity;
  • Risk from proximity or Source Protection Zone 1 hazards;
  • Abstraction point site inspections: risk to borehole headworks (including flooding (pluvial and fluvial), ingress, borehole integrity and air vents), including review of the suitability of control measures in place (such as site drainage and maintenance inspections); and
  • Risk from on-site stores of effluent (e.g. cess pits/septic tanks), including suitability of any control measures in place.

Requirements:

2. The Company are required to satisfy the following:

a. Review of a risk assessment:

1. Carry out a review of the risk assessments for all the Company’s groundwater catchments. The review or completion of new risk assessments (as applicable where risk assessments are found to be absent) must include the risks as outlined in section 1, that the Inspectorate has found to be deficient.

Date by which requirement must be satisfied: COMPLETE

2. Carry out a review of the risk assessments for all the Company’s abstraction sites. The review or completion of new risk assessments (as applicable where risk assessments are found to be absent) must include the risks as outlined in section 1, that the Inspectorate has found to be deficient.

Date by which requirement must be satisfied: COMPLETE

3. Carry out a review of the risk assessments for all the Company’s surface water catchments. The review or completion of new risk assessments (as applicable where risk assessments are found to be absent) must include the risks as outlined in section 1, that the Inspectorate has found to be deficient.

Date by which requirement must be satisfied: 30 September 2025.

b. Reporting:

1. Submit the revised or new risk assessment (as appropriate) as outlined in section 1 and 2, accompanied by a Board level Director sign-off.

Date by which requirement must be satisfied: As soon as reasonably practicable upon completion. It is anticipated this would be by 30 November 2025, to allow for the annual submission review in October.

Signed

Nicholas Adjei

Deputy Chief Inspector, on behalf of the Secretary of State for Environment, Food and Rural Affairs

25 October 2024

Reference: PRT-2020-00002 v3