Southern Water Services Limited – Burpham CWT Enabling Works

Notice under regulation 28(4) of the Water Supply (Water Quality) Regulations 2016 (as amended)

Reference: SRN-2024-00009

Version Number: 1

Water undertaker as appointed under section 6 of the Water Industry Act 1991 (as amended): Southern Water Services Limited, with registered number 02366670 (hereinafter called ‘the Company’).

Assets Affected:

TS017 – Burpham Water Treatment Works

Y009 – Worthing Supply System

Details of this Notice:

  1. The Drinking Water Inspectorate (‘the Inspectorate’) has received a regulation 28(1) report of the Water Supply (Water Quality) Regulations 2016 (as amended) (‘the Regulations’) from the Company dated 15 February 2024, which states that there is or has been a significant risk of supplying water from Burpham Water Treatment Works (and associated assets as applicable) that could constitute a potential danger to human health or could be unwholesome.
  2. Consequently, this Notice is served on the Company by the Inspectorate on behalf of the Secretary of State, under regulation 28(4) for the assets listed above, for risks associated with:

Description of Risk

Hazard/ Hazardous Event/ Parameter

Hazard I D

Microbiological contamination due to ingress

Total Coliforms

48997

Microbiological contamination due to ingress

E. coli

48988

Microbiological contamination due to ingress

Clostridium Perfringens

48995

Microbiological contamination due to ingress

Enterococci

48999

Structural integrity of asset at risk

No Supply

49053/49054/49055

Table 1: Table of the hazards, hazardous events, and/or parameters covered by this Notice, including the Hazard I D numbers and the description of risks.
  1. The Company are required to satisfy the following requirements.

The date given is that until or by which the requirements must be maintained or satisfied, as appropriate.

Requirements:

(a) To maintain the following measures for the period specified in each case:

  1. Operation of Burpham CWT in accordance with Company policy, procedures and to internally agreed process parameters.
    Date: Ongoing for the duration of this Notice
  2. Ongoing monitoring of regulatory and operational sample results and online data.
    Date: Ongoing for the duration of this Notice
  3. Enhanced large volume sampling and enhanced data assessment at frequency set out in audit strategy.
    Date: Ongoing for the duration of this Notice
  4. Monitor and track trends for customer contacts in downstream water supply zones.
    Date: Ongoing for the duration of this Notice
  5. Investigate any reports of illness contacts in downstream water supply zones.
    Date: Ongoing for the duration of this Notice
  6. Carry out Remote Operated Vehicle (ROV) surveys at frequency set out in audit strategy.
    Date: Ongoing for the duration of this Notice

(b) To review, revise or make operational the following measures, by the dates specified in each case:

  1. Plan and undertake enabling works to remove both Burpham CWT from supply for inspection and flood testing.
    Date: 30 September 2024

(c) To audit whether the measures have been effective by the following means:

  1. Define an audit strategy to monitor the effectiveness of the measures specified in sections (a) and (b).
    Date: 31 May 2024
  2. Implement, and keep under continuous review, the audit strategy defined in measure (c)1.
    Date: Following completion of measure (c)1. onwards.

(d) Not to supply water for regulation 4(1) purposes from Burpham CWT, or not to so supply unless the specified conditions below are satisfied:

  1. Not Applicable

(e) To provide the following information in the time and manner specified below to enable monitoring of progress towards the mitigation of the risks:

  1. Provide a progress report annually.
    Date: by 31 January each year.
  2. Provide report evidencing enabling works to remove Burpham CWT from supply for inspection and flood testing.
    Date: 31 October 2024
  3. Submit the audit strategy for auditing the effectiveness of the measures, as specified in measure (c)1.
    Date: 30 June 2024
  4. Submit any revisions of the audit strategy produced under measure (c)2.
    Date: Within 1 month of a revision
  5. Submit a report in the event that any completed measures of this Notice need to be altered in any way, for any reason.
    Date: Ongoing for the duration of this Notice
  6. Submit a satisfactory completion report accompanied by a revised regulation 28(1) report with Board level Director sign-off.
    Date: 31 October 2024

Further Details of this Notice:

  1. Any product or substance used as a result of the requirements in this Notice must comply with regulation 31.
  2. Under regulation 28(6) the Inspectorate, on behalf of the Secretary of State, may by notice served on the Company, revoke or vary this Notice.
  3. Failure by the Company to comply with this Notice may result in enforcement proceedings under section 18 of the Water Industry Act 1991 (as amended).

Signed

Nicholas Adjei
Deputy Chief Inspector, on behalf of the Secretary of State for Environment, Food and Rural Affairs
16 April 2024
Reference: SRN-2024-0009 v1

Back to top